The X-Spray PT2000 Spraying Workstation is a fully proprietary solution developed by Xinke Intelligent, encompassing its structural design, controllers, and software algorithms. It is widely applicable for spraying fiberglass in bathtubs and applying glaze to ceramics. This product represents China's largest hybrid robot featuring both parallel and serial structures, marking a pioneering achievement in the country.
Teach the robot spraying path with simple drag-and-drop operations. The system precisely replicates the path through motion control. The entire equipment structure and core system are independently developed, featuring proprietary innovative technology.


Drag-and-drop teaching mode eliminates programming, offering flexible and convenient control that even beginners can master quickly.
Custom-engineered for bathroom glazing applications, ensuring hassle-free installation and maintenance throughout its lifecycle.
Fully servo-motor controlled for smooth, stable, and reliable operation.
Built-in dust collection system paired with glaze recycling minimizes material waste and pollutant emissions.
Equipped with safety doors to effectively isolate operational risks.
Ensures uniform, smooth glaze application, significantly reducing glaze consumption and boosting overall production efficiency.
This product is widely applicable for spraying sanitary ware such as toilets (sitting toilets), basins, washbasins, squat toilets, mop sinks, urinals, pedestal sinks, and vanity units, fully meeting their glazing requirements.
1. Comprehensive Spraying Coverage: Achieves up to 99.9% coverage area
2. Superior Coating Performance: Ensures consistent coating quality and uniformity through coordinated control
3. High spraying efficiency: 24-hour continuous operation with high spraying effectiveness
4. Durable machinery: Key components sourced from industry-leading brands ensure a service life of 5-6+ years
5. Simple operation: No professional engineer required; mastered in 5 minutes
6. High cost-effectiveness: Rapid equipment commissioning and high production efficiency significantly shorten the payback period